Concrete Calculator

Calculate concrete volume in cubic yards for slabs, footings, and columns.

๐Ÿ“

Dimensions

years
years
years
%
๐Ÿ“ฆ

Bags & Pricing

$

Concrete Needed

1.63 cu yd

Cubic ft 44.00Bag estimate 98 bags
๐Ÿ“ฆ

Bag Option

Bag Size60 lb
Bags Needed98
Total Cost$588.00
๐Ÿšš

Ready-Mix Option

Volume1.63 cu yd
Order (rounded)2 cu yd

Ready-mix is cheaper than bags for pours above 1 cu yd.

๐Ÿค Found this helpful?

Give it a like โ€” it helps others discover it

Share this:

About this calculator

How Much Concrete Do You Need?

Concrete is ordered by the cubic yard. Over-ordering wastes hundreds of dollars; under-ordering means a cold joint and a weaker slab. This calculator gives you the exact cubic yards, bags, and estimated cost for slabs, footings, and columns.

The Concrete Volume Formula

Volume (cu yd) = (Length ร— Width ร— Depth in ft) รท 27

The 27 divides cubic feet into cubic yards, the standard unit for ordering concrete.

Worked Example: 10 x 10 ft Slab, 4" Thick

  • Length: 10 ft
  • Width: 10 ft
  • Depth: 4 inches = 0.333 ft
  • Volume: (10 ร— 10 ร— 0.333) รท 27 = 1.23 cubic yards
  • Order 1.5 yards (add 10% for spillage and uneven subgrade)

Bagged Concrete vs Ready-Mix

VolumeBest Option
Under 1 cu ydBagged concrete (60-80 lb bags)
1-3 cu ydReady-mix (minimum order usually 1 yd)
3-10 cu ydReady-mix delivery
10+ cu ydReady-mix, multiple trucks

Bag math: 80 lb bag = 0.6 cu ft. 60 lb bag = 0.45 cu ft. 45 bags of 80 lb = 1 cu yd.

Common Concrete Projects

ProjectTypical Thickness
Patio / walkway4 inches
Driveway (cars)4-5 inches
Driveway (heavy trucks)6 inches
Garage slab4-6 inches
Footings6-12 inches
Shed base4 inches

Cost Estimate (2026 US)

  • Ready-mix concrete: $130-$180 per cubic yard
  • Delivery fee: $50-$200
  • Short load fee: $50-$100
  • Bagged concrete: $4-$7 per 80 lb bag
  • Finishing labor: $2-$5 per sq ft

Frequently Asked Questions

How many 80 lb bags of concrete in a yard?

45 bags of 80 lb make 1 cubic yard.

How much does a yard of concrete cover?

1 cubic yard covers 81 sq ft at 4 inches thick.

How thick should a driveway be?

4 inches for cars, 5-6 inches for trucks, RVs, or heavy loads.

How long before I can walk on new concrete?

24-48 hours for foot traffic, 7 days for vehicles, 28 days for full cure.

Do I need rebar in a slab?

For driveways and structural slabs, yes. Use #3 or #4 rebar on 12-24 inch centers.

What is the difference between concrete and cement?

Cement is one ingredient in concrete. Concrete = cement + sand + gravel + water.

Related Tools on Qudexa

๐Ÿค Found this helpful?

Give it a like โ€” it helps others discover it

Share this:

Explore more tools

Free calculators for finance, health, and everyday life.